Day: 26 January 2009
Ilminster Canal – 25th January 2009
We met down the river but as it was like a raging torrent we decided to give the canal a go for a change. There were only five of us so we made sure we had plenty of room between pegs and I drew peg 4, which was where I was last time. The level was quite high and most of the …